Digital Panel Meter helps to measure Basic Parameters precisely El Measure Demand Control helps to control plants KVA demand and stay within sanctioned limits and avoiding huge penalties, and also plants monthly energy bill could be reduced by 15%

The energy consumption of different processes could be monitored in real time and energy losses can be identified and eliminated. It helps in increasing the efficiency of the manufacturing process thus increasing productivity and reducing production cost. With El Measure’s EMS, equipment breakdowns can be avoided with an effective maintenance schedule which helps to reduce maintenance cost.

A better manpower planning and utilization can be achieved. Monthly energy reports can be generated for different processes and total unit. The plants KVA demand could be managed within sanctioned limits thus avoiding huge penalties. It has an Inbuilt Selector Switch and High-resolution reading with autoscaling. Suitable for industrial panels, gen-sets, solar, pump control panels, etc. Optional RS485 for data collection. Optional easy interface to PLC through Modbus protocol.

It can be used both for AC & DC Measurement and can be used for Equipment Monitoring, Genset, Solar and UPS applications in control panel to measure different electrical loads